The City of Tifton has more than 135 miles of streets to maintain. This Street Condition map from 2023 indicates what streets are in need of resurfacing with red and orange lines. Based on this street study, we are in the process of paving 5.6 miles of those streets that were in terrible condition. Over the next 9 months, based from the same street study, we will be working on an additional 8.5 miles of road. Before we can paving this 8.5 miles of streets, we have to upgrade water and sewer lines under the road. There is great care taken by the City to insure we resurface the most critical streets first. Please be patient as we work down the list. To see the Road Conditions Map, click here.